Akhisar Stormwater Line
An urban stormwater drainage line built with a precast box-culvert system in the centre of Manisa Akhisar.
A Precast Solution for Urban Drainage
Along the central spine of the Akhisar district of Manisa, a central stormwater line was constructed using a precast box-culvert system to support existing urban drainage. Within the scope of the work tendered by MASKİ, the on-site transport and assembly works were carried out entirely by FTK Group.
Precast elements were produced off-site to shorten in-city assembly time and minimise traffic impact. The line was commissioned and handed over to the authority within the committed timeline.
Site Photography
Numbers That Define the Project
- 1line
Central stormwater line
- 100%
Completion rate
- MASKİ
Authority
- 0incidents
Site safety performance
Operational Discipline in Urban Drainage
- 01
Precast Production
Box-culvert elements were produced off-site under controlled conditions to ensure quality consistency and faster delivery.
- 02
Traffic Flow Coordination
Continuous access was maintained under heavy in-city traffic using a phased assembly plan.
- 03
Authority Coordination
The line was commissioned within the planned schedule through continuous coordination with MASKİ technical teams.
Other References

Direcik & Kozalaklı Viaducts
End-to-end construction of two major viaducts on the Aydın-Denizli Motorway; delivered with 101,455 m³ of concrete and 20,000 tons of rebar.

V01 Viaduct
Construction of a 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing toward year-end delivery.

Horozgediği Logistics Warehouse
Construction of a 12,000 m² enclosed industrial warehouse in İzmir Aliağa Horozgediği; reinforced-concrete lower section, steel upper section and façade panel cladding.