An end-to-end FTK Group delivery for the construction and assembly of the Direcik and Kozalaklı viaducts on the Aydın-Denizli Motorway.
Strategic Viaduct Structures on a Motorway Corridor
Along the Aydın-Denizli corridor — one of Türkiye's important motorway routes — FTK Group engineering and field teams carried out the full reinforced-concrete works of the Direcik and Kozalaklı viaducts forming the main-line crossings.
Throughout the project, 101,455 m³ of concrete were poured and 20,000 tonnes of rebar steelwork carried out; support was also provided for the construction of small engineering structures at various locations. The full scope was delivered to the client within committed schedule and quality.
Site Photography
Numbers That Define the Project
- 101,455m³
Concrete poured
- 20,000tons
Reinforcement steel
- 2structures
Major viaducts
- 0incidents
Site safety performance
Engineering Solutions Produced On Site
- 01
Multi-Structure Site Management
In addition to the main-line viaducts, large and small engineering structures were planned and executed under one integrated site programme.
- 02
High-Volume Concrete & Steel Discipline
The high concrete and rebar volumes required for motorway viaducts were managed with continuous fresh-concrete quality control and laboratory follow-up.
- 03
Schedule Assurance
Aligned with the motorway opening programme, the project was delivered within the committed timeline.
Other References

Akhisar Stormwater Line
Central urban stormwater drainage built with a precast box-culvert system in the centre of Manisa Akhisar.

V01 Viaduct
Construction of a 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing toward year-end delivery.

Horozgediği Logistics Warehouse
Construction of a 12,000 m² enclosed industrial warehouse in İzmir Aliağa Horozgediği; reinforced-concrete lower section, steel upper section and façade panel cladding.