
Projects That Leave a Mark
Selected reference projects FTK Group has completed and continues since 2021. Each project is the tangible result of our engineering discipline, on-site capability and schedule-and-budget management.
- 9+Years of Sector Experience
- 5+Major Infrastructure Projects
- 50+Expert Field Team
- 250K m³+Concrete Poured
Selected References
TÜRKİYE — BRIDGE & VIADUCTDirecik & Kozalaklı Viaducts
End-to-end construction of two major viaducts on the Aydın-Denizli Motorway; delivered with 101,455 m³ of concrete and 20,000 tons of rebar.
2021 – 2024BRIDGE & VIADUCT
TÜRKİYE — INFRASTRUCTUREAkhisar Stormwater Line
Central urban stormwater drainage built with a precast box-culvert system in the centre of Manisa Akhisar.
2024 – 2025INFRASTRUCTURE
TÜRKİYE — BRIDGE & VIADUCTV01 Viaduct
Construction of a 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing toward year-end delivery.
2025 – 2026BRIDGE & VIADUCT
TÜRKİYE — SUPERSTRUCTUREHorozgediği Logistics Warehouse
Construction of a 12,000 m² enclosed industrial warehouse in İzmir Aliağa Horozgediği; reinforced-concrete lower section, steel upper section and façade panel cladding.
2025 – 2026SUPERSTRUCTURE
TÜRKİYE — BRIDGE & VIADUCTKaranlıkdere Balanced Cantilever Viaduct
Construction of a 286-metre, three-span balanced-cantilever viaduct on the Kastamonu-Çankırı (Kırık Dam Variant) road.
2026 – 2028BRIDGE & VIADUCT