Horozgediği Logistics Warehouse
Construction of a 12,000 m² enclosed industrial warehouse in İzmir Aliağa Horozgediği; reinforced-concrete lower section, steel upper section and façade panel cladding.
Hybrid System for Industrial Superstructure
In the Horozgediği locality of İzmir Aliağa, FTK Group is constructing an industrial warehouse with a total enclosed area of 12,000 m². The structure is designed by erecting a steel upper section on top of a 6.40-metre reinforced-concrete lower section, reaching a total height of 10.40 metres. The perimeter of the upper section will be clad with façade panels.
Of the total area, 4,000 m² has been completed; the remaining works are planned to be finished and delivered to the client by year end.
Site Photography
Numbers That Define the Project
- 12,000m²
Total enclosed area
- 33%
Completion rate
- 6.40m
Reinforced-concrete height
- 4m
Steel superstructure height
Hybrid Building System and Façade Integrity
- 01
Hybrid Structural System
A steel superstructure on a reinforced-concrete base provides both load-bearing capacity and wide-span flexibility.
- 02
Façade Panel Integration
An industrial façade-panel system protects the structural envelope from thermal and weather effects while delivering a consistent architectural skin.
- 03
Phased Delivery
Of the 12,000 m² total area, 4,000 m² is complete; the full scope is planned to be commissioned by year end.
Other References

Direcik & Kozalaklı Viaducts
End-to-end construction of two major viaducts on the Aydın-Denizli Motorway; delivered with 101,455 m³ of concrete and 20,000 tons of rebar.

Akhisar Stormwater Line
Central urban stormwater drainage built with a precast box-culvert system in the centre of Manisa Akhisar.

V01 Viaduct
Construction of a 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing toward year-end delivery.