V01 Viaduct
A 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing rapidly toward its year-end delivery target.
Main-Line Viaduct Works on a State Motorway
The production, assembly and on-site fabrication of the V01 viaduct — forming the main-line crossing of the Ankara-Kırıkkale-Delice Motorway — are carried out in partnership with Fernas İnşaat by FTK Group engineering and field teams.
The project covers a total of 700 metres of viaduct fabrication. Approximately 80% of the structure has been completed; remaining works are targeted to be delivered by year end.
Aerial Footage
Site Photography
Numbers That Define the Project
- 700m
Total viaduct length
- 80%
Completion rate
- 2026
Target delivery year
- 1structure
Main-line viaduct
Speed and Engineering Discipline on Site
- 01
Rapid Progress
With 80% of the structure complete, remaining works are sequenced under the year-end delivery target with disciplined site planning.
- 02
Main-Line Fabrication
The viaduct, forming the motorway's main-line crossing, is integrated with connection roads, transition curves and traffic flow.
- 03
Joint-Venture Coordination
Run in partnership with Fernas İnşaat, the project is sustained with multi-party site coordination under engineering discipline.
Other References

Direcik & Kozalaklı Viaducts
End-to-end construction of two major viaducts on the Aydın-Denizli Motorway; delivered with 101,455 m³ of concrete and 20,000 tons of rebar.

Akhisar Stormwater Line
Central urban stormwater drainage built with a precast box-culvert system in the centre of Manisa Akhisar.

Horozgediği Logistics Warehouse
Construction of a 12,000 m² enclosed industrial warehouse in İzmir Aliağa Horozgediği; reinforced-concrete lower section, steel upper section and façade panel cladding.