ONGOING PROJECT
BRIDGE & VIADUCT

V01 Viaduct

A 700-metre main-line viaduct on the Ankara-Kırıkkale-Delice Motorway, advancing rapidly toward its year-end delivery target.

OVERVIEW

Main-Line Viaduct Works on a State Motorway

The production, assembly and on-site fabrication of the V01 viaduct — forming the main-line crossing of the Ankara-Kırıkkale-Delice Motorway — are carried out in partnership with Fernas İnşaat by FTK Group engineering and field teams.

The project covers a total of 700 metres of viaduct fabrication. Approximately 80% of the structure has been completed; remaining works are targeted to be delivered by year end.

From the Field

Aerial Footage

Gallery

Site Photography

TECHNICAL SUMMARY

Numbers That Define the Project

  • 700m

    Total viaduct length

  • 80%

    Completion rate

  • 2026

    Target delivery year

  • 1structure

    Main-line viaduct

HIGHLIGHTS

Speed and Engineering Discipline on Site

  • 01

    Rapid Progress

    With 80% of the structure complete, remaining works are sequenced under the year-end delivery target with disciplined site planning.

  • 02

    Main-Line Fabrication

    The viaduct, forming the motorway's main-line crossing, is integrated with connection roads, transition curves and traffic flow.

  • 03

    Joint-Venture Coordination

    Run in partnership with Fernas İnşaat, the project is sustained with multi-party site coordination under engineering discipline.