ONGOING PROJECT
BRIDGE & VIADUCT

Karanlıkdere Balanced Cantilever Viaduct

Construction of a 286-metre, three-span balanced-cantilever viaduct on the Kastamonu-Çankırı (Kırık Dam Variant) road.

OVERVIEW

Field Engineering on a Balanced-Cantilever System

Constructed within the scope of the Kastamonu-Çankırı (Kırık Dam Variant) road, the Karanlıkdere viaduct is a three-span bridge structure built with the balanced-cantilever method. With a total length of 286 metres, the production, assembly and on-site fabrication are carried out by FTK Group as subcontractor under the employer partnership of Cengiz İnşaat & HGG İnşaat.

The total scope includes 26,239 m³ of concrete and 5,977 tonnes of reinforcement-steel works. The planned schedule is 18 months and works are progressing rapidly under disciplined site management.

TECHNICAL SUMMARY

Numbers That Define the Project

  • 286m

    Total viaduct length

  • 26,239

    Concrete works

  • 5,977tons

    Reinforcement steel

  • 3spans

    Number of spans

HIGHLIGHTS

Balanced-Cantilever System and Site Discipline

  • 01

    Balanced-Cantilever Method

    The balanced-cantilever construction method was selected to suit span characteristics; structural balance is maintained through symmetric advance from the support axis.

  • 02

    High-Volume Concrete & Steel

    26,239 m³ of concrete and 5,977 tons of reinforcement steel are managed with site logistics and laboratory follow-up.

  • 03

    18-Month Schedule Discipline

    The 18-month planned schedule is sustained through disciplined site planning of timeline and resources.